How long are 811 locates good for in NY?
Table of Contents
How long are 811 locates good for in NY?
Excavation must begin within 10 working days of the date we receive your request. To avoid unnecessary delays, contact New York 811 before the 10-day period is scheduled to expire to request a remarking.
Is Dig Safe NY free?
Whether dialing the 1-800 number or 811, there is no charge for the call.
What is Dig Safe New York?
UDig NY is the place where all safe digging in Upstate New York starts. As the link between you and the underground utility operators, UDig NY utilizes a contact center and industry-leading software — Exactix — to receive and transmit notifications of intent to dig in the form of underground utility location requests.
Does an excavator have to contact 811 even when working on private property?
3. They think 811 is for professional excavators. Another reason for no call excavations among homeowners is that they think the 811 call before you dig process is only applicable to professional excavators. In reality, anyone performing digging activity needs to submit an 811 ticket request.
What do Dig Safe markings mean?
“Pre-mark” where you plan to dig before making the call to 811. Pre-marking means to mark out the area on the ground where the work will take place, using white stakes, paint or flags. Note that pre-marking requirements vary slightly from state to state. Download Laws/Rules.
How does Dig Safe make money?
Dig Safe® is a not-for-profit clearinghouse that notifies participating utility companies of your plans to dig. In turn, these utilities (or their contract locating companies) respond to mark out the location of their underground facilities. Dig Safe is a free service, funded entirely by its member utility companies.
How do I check my pipes before digging?
Anyone who plans to dig should call 811 or go to their state 811 center’s website before digging to request that the approximate location of buried utilities be marked with paint or flags so that you don’t unintentionally dig into an underground utility line.
What is a locate request?
A locate request is a communication between an excavator and one call center personnel in which a request for locating underground facilities is processed.
Who pays for DigAlert?
This is a 100% free service, and more importantly-it’s the law. Legally, the person who is doing the work must have a DigAlert in their name.
How do you read 811 markings?
As a quick refresh, the APWA color code for utility marking is:
- Red: electric power lines, cables, conduit and lighting cables.
- Orange: telecommunication, alarm or signal lines, cables or conduit.
- Yellow: natural gas, oil, steam, petroleum or other flammable.
- Green: sewers and drain lines.
- Blue: potable drinking water.
What happens if you dont Dial Before You Dig?
Since DBYD is now a mandatory first step before digging, failure to do so can result in large financial penalties (in the case of damage and even otherwise). In NSW, the penalty is now $22,000 for individuals and $44,000 for companies.
How long do Dial Before You Dig last?
Safety requirements for working close to the member’s pipes or cables; Legal statements relating to liability, conditions, warranties or any other legal requirements; A “Valid To” Date (Recommended twenty-eight (28) days from date of issue).
What do the dig safe colors mean?
Blue – Potable Water. Green – Sewer/Drainage. Yellow – Gas/Petroleum Pipe Line. Purple – Reclaimed Water.
What happens if I hit a water line while digging?
Even striking a single line while you dig can cause serious injury, fines, high repair costs, and outages. So, even if you’re digging only a few inches underground, we highly recommend you have your utilities marked to avoid the risk of striking an underground utility.