What time does Mumbai Metro start from Versova?
Table of Contents
What time does Mumbai Metro start from Versova?
Currently the first train from Versova metro station starts at 07:53 AM and from Ghatkopar metro station the first train starts at 8:01 AM. What time does Mumbai Metro close? Currently the last train from Versova metro station departs at 09:08 PM and the last train from Ghatkopar departs at 09:27 PM.
How many Metro Trains are there in Mumbai?
In 2018, Mumbai Metropolitan Region Development Authority which will operate all metro lines except Line 3, awarded a tender to Bharat Earth Movers (BEM) to supply 63 trainsets (378 coaches) for Yellow Line (line 2) and Red Line (line 7) at a cost of ₹3,015 crores ($427.33 million).
What is the current technology of Mumbai Metro Line 1?
The network’s signalling and train control systems will be based on LZB 700M technology. On 21 October 2019, exactly after 1,960 days (approx. 5 years) of Mumbai Metro Line 1’s inception, the system crossed 60 crore passengers, with an average daily ridership of around 4,50,000 (4.5 lakh) passengers.
Where are the coaches of Mumbai Metro made?
The coaches will be manufactured in Bombardier’s manufacturing plant in Savli, Gujarat . Unlike 97% of metro corridors worldwide which run on direct current (DC), the Mumbai Metro runs on alternating current (AC) which is more labour and cost-intensive.
What are the timings of Ghatkopar metro?
The first train from Ghatkopar metro station starts at 08:15 AM and the last train departs at 09:15 PM The frequency of metro trains during peak hours is 4 minutes and during the non-peak hours it’s 8 minutes. Yellow Line 2 – Stations
What is 4545 Trip Pass in Mumbai Metro?
45 Trip Pass is a monthly (discount) pass for Mumbai Metro that offer 45 trips on the entire network that connects Ghatkopar and Versova. Is Mumbai Metro underground? The Colaba-Bandra-SEEPZ line, also called Line 3 of the Mumbai Metro, is an ongoing project being implemented by the Mumbai Metro Rail Corporation Limited (MMRCL).