What is the purpose of the Millau Viaduct?

What is the purpose of the Millau Viaduct?

The viaduct was built to combat congestion on local roads around Millau during the summer holidays. Before her construction traffic needed to descend into the valley to traverse the area.

What type of bridge is the Viaduc de Millau?

ViaductCable‑stay… bridge
Viaduc de Millau/Bridge type

Who designed the Millau bridge?

Michel VirlogeuxNorman Foster
Viaduc de Millau/Architects

Is Millau Viaduct important landmark for country?

Being a magnificent example of bridge work, Millau Viaduct has established itself as one of the must-see modern monuments in the country, it is interesting to be noted that the viaduct actually connects two limestone plateaus, the Causse du Larzac and the Causse Rouge, nonetheless, the height of the tallest masts that …

Why was the Millau bridge built?

The Millau Viaduct was built to help tourists get to their destinations, but this bridge may just become a destination itself.

How was Viaduc de Millau built?

Construction of the Millau Viaduct began in December of 2001. The first stages were focused heavily on building the massive piers that would support the roadway high above the valley floor. Layer by layer, the concrete piers were erected. Each one was built as a single, hollow shaft.

When was the Millau bridge built?

October 16, 2001Viaduc de Millau / Construction started

What materials are used in the Millau Viaduct?

ConcreteSteel
Viaduc de Millau/Materials

Construction work used approximately 127,000m³ of concrete, 19,000t of steel-reinforced concrete and 5,000t of pre-constraint steel, namely cables and shrouds.

What are the three challenges involved in building the viaduct?

Millau Viaduct multiple span single line cable stayed Bridge the tallest bridge in the world….From the start the construction team faced 3 main challenges.

  • Build the tallest bridge piers in the world.
  • Put a 36000 ton free way on top of them.
  • Erect 7 steel pylons each weights 700 tons.

What is the Millau bridge made of?

Construction work used approximately 127,000m³ of concrete, 19,000t of steel-reinforced concrete and 5,000t of pre-constraint steel, namely cables and shrouds. The project needed 205,000t of concrete, of which 50,000m³ is reinforced. In total, the viaduct weighs 290,000t.

Where was the Millau bridge built?

MillauFranceCreissels
Viaduc de Millau/Location