Who built 427 extension?
Table of Contents
Who built 427 extension?
LINK 427 won the contract to design, build, finance and maintain the project. LINK 427’s team included: Developer: ACS Infrastructure Canada Inc. and Brennan Infrastructures Inc.
Who is LINK 427?
LINK 427 is the consortium responsible for the Design, Construction, Finance and Maintenance of the Highway 427 Expansion Project in Ontario. The Project will be delivered by Infrastructure Ontario and the Ministry of Transportation through the Alternative Finance and Procurement (AFP) model.
Who owns the 427?
Ministry of Transportation of Ontario
Ontario Highway 427
Highway 427 | |
---|---|
Maintained by Ministry of Transportation of Ontario | |
Length | 27 km (17 mi) |
Existed | December 4, 1971–present |
Major junctions |
Why is the 427 extension closed?
The $616-million extension of Highway 427 near Toronto sits unused and off-limits to drivers amid a legal dispute between the Doug Ford government and LINK427, the private consortium hired to build it, CBC News has learned.
How far will the 427 extension go?
VAUGHAN – The Ontario Government is opening a 10-kilometre expansion of Highway 427 from Finch Avenue to Major Mackenzie Drive to help improve traffic flow, reduce congestion and move people and goods safely.
Where is the new 427 extension?
VAUGHAN
VAUGHAN – The Ontario Government is opening a 10-kilometre expansion of Highway 427 from Finch Avenue to Major Mackenzie Drive to help improve traffic flow, reduce congestion and move people and goods safely.
Is Highway 427 being extended?
On August 8, 2020, LINK427 will permanently close to the travelling public York Regional Road 99 between Highway 7 and Zenway Boulevard so that the Highway 427 Extension between Highway 7 and Major Mackenzie Drive can be constructed in its place. There will no longer be any access to Zenway Boulevard from Highway 427.
Is 427 Open to Major Mackenzie?
The Ontario Ministry of Transportation and Infrastructure Ontario, in partnership with LINK427, are pleased to announce that on September 18, 2021, the Highway 427 Expansion project from Finch Avenue to Major Mackenzie Drive will open.
Where does the new 427 go?
The Highway 427 extension provides economic benefits to the province by offering an enhanced freeway route into York Region, the Vaughan Business area and the CPR Vaughan Intermodal Facility.
Where does the new 427 extension end?
Major Mackenzie Drive
How far is 427 being extended?
How much did the 427 extension cost?
$616 million
The extension of the 427 was commissioned in 2015 for $616 million. The Link 427 General Partnership includes ACS Infrastructure Canada Inc., Brennan Infrastructures Inc., and Bot Construction Group.