What is a spec section in construction?
Table of Contents
What is a spec section in construction?
Construction specifications, or specs, detail the work and workmanship required for each construction project. A specs definition is “written documentation describing the scope of work, any materials that are to be used, the methods of installation, and the quality of workmanship under contract.”
What type of information is specified in Division 01 General Requirements?
DIVISION 01 – GENERAL REQUIREMENTS d. Construction Phase – Fire Safety, Protection and Alarm Inspection The Contractor shall initiate and schedule PFA fire safety, protection and alarm inspections.
What is Division 26 construction?
Division 26 – Electrical and Lighting.
What is included in construction general Requirements?
General Requirements: defines the specific protocols for administrative programs associated with a given project, and each respective trade or division (CSI), such as submittals, scheduling req’s, LEED, payment apps, permitting, inspections, daily logs, RFIs, progress meetings and meeting minutes, and all other project …
What type of construction materials are covered in Division 8 of the technical specifications of a construction contract?
Division 1: General Requirements.
What are the types of specifications in construction?
There are two types of specifications.
- General Specifications.
- Detailed Specifications.
What are Division 26 specifications?
Division 26 – Electrical – Master Specifications/Design Guidelines
File Name | File Title |
---|---|
26 13 02.docx | Medium-Voltage Pad Mounted Switchgear (Outdoor) |
26 13 16.docx | Medium-Voltage Fusible Interrupter Switchgear |
26 18 23.docx | Medium-Voltage Surge Arresters |
26 22 00.docx | Low-Voltage Transformers |
What division is 27 in Masterformat?
Division 27 – Communications – Transportation and Infrastructure.
What CSI division is communications?
DOA Division 27
DOA Division 27 – Communications – Master Specifications/Design Guidelines.
What is the difference between GC and GR?
To oversimplify, General Conditions is the bigger bubble of what is expected of how the project will run and General Requirements is the bubble within that lays out more detailed rules for said project.
What is GC and GR in construction?
What is a construction CCD?
Construction Change Directives. Change orders are not the only way for the owner to change the work. Most contracts also allow the owner to unilaterally change the work without agreement from the contractor through a “construction change directive” or “CCD.” 2. CCD is the term used under the AIA documents.
What is GCC in construction?
The General Conditions of Contract for Construction Works, which is commonly referred to as. GCC 2004, contains 58 clauses that establish the general risks, liabilities and obligations of. the contracting parties and the administrative procedures for the administration of the contract.
What does Gr mean in construction?
General Requirements are used as the clearinghouse for items that do not apply directly to construction, the cost of which are customarily spread out over the entire project. These costs are also referred to as project overhead. For estimating purposes, either term is acceptable.