Who owns the Kewaunee nuclear power plant?

Who owns the Kewaunee nuclear power plant?

Dominion Generation

Kewaunee Power Station
Construction cost $776.15 million (2007 USD) ($952 million in 2020 dollars)
Owner(s) Dominion Generation
Operator(s) Dominion Generation
Nuclear power station

Why did Kewaunee nuclear plant close?

KEWAUNEE – In a county that has four times as many cows as people, the loss of Kewaunee Power Station’s 600 high-paying jobs and its tax contributions was a hard blow. Owner Dominion Energy of Richmond, Virginia, closed the nuclear power plant in May 2013 after failing to find a buyer.

When did Kewaunee nuclear plant shut down?

May 7, 2013
Kewaunee was considered industry wide as a well-run power plant, one that rarely had operational or regulatory issues. Yet, it still permanently closed on May 7, 2013 after 39 years of operation. It wasn’t regulations or public opposition that shut it down, but economics.

Why is Davis Besse closing?

Davis–Besse was expected to close in 2020 as it is no longer profitable to run when competing against natural gas plants. Plans were updated indicating possible shut down by May 31, 2020.

How many nuclear power plants are in Wisconsin?

three nuclear power plants
Nuclear power in Wisconsin produces approximately 14 percent of the state’s electricity on an annual basis. Currently in Wisconsin, there are three nuclear power plants, Point Beach, Kewaunee, and the La Crosse Boiling Water Reactor (BWR). Only the Point Beach nuclear power plant is currently operational.

When was the Kewaunee nuclear plant built?

The Kewaunee plant, which opened in 1974, was sold in 2005 to Dominion, based in Richmond, Va., by its owners, the Wisconsin Public Service Corporation and Wisconsin Power and Light.

Who owns Davis-Besse nuclear plant?

FirstEnergy Nuclear Operating Company
Owned by FirstEnergy Nuclear Operating Company, Davis-Besse is a pressurized-water nuclear reactor that produces 908 megawatts of electricity, enough to power 450,000 homes without producing greenhouse gasses.

What happened at Davis-Besse?

Background. On March 5, 2002, maintenance workers at the Davis-Besse nuclear power plant in Oak Harbor, Ohio, discovered a football-sized void in the reactor vessel head. The void, caused by corrosion, did not cause a reactor accident, and did not actually cause any problems while the reactor was operating.

Who owns nuclear plants in Ohio?

Energy Harbor
The Perry Nuclear Power Plant is located on a 1,100 acres (450 ha) site on Lake Erie, 40 miles (64 km) northeast of Cleveland in North Perry, Ohio, US. The nuclear power plant is owned and operated by Energy Harbor (Formerly FirstEnergy Solutions).

Is Zimmer power plant closing?

announced the closing date in July 2021. In September 2020, Vistra announced that it would close the Zimmer power plant by “year-end 2027 or sooner should economic or other conditions dictate.” Last year, Vistra said it is accelerating the closure of Zimmer as the company continues its transition away from coal.

How many nuclear plants are in Ohio?

two nuclear power plants
Ohio has two nuclear power plants, both located along the shores of Lake Erie in the northern part of the state. They are the Davis-Besse plant in Oak Harbor, near Sandusky, and the Perry Nuclear Plant, east of Cleveland.

  • September 9, 2022